Merseyside & Northern Wales is GSP group D, covering Merseyside, Cheshire and the whole of North Wales. It is one of two areas operated by SP Energy Networks and one of the largest by geography.
Agile is priced per distribution area. Every half-hour comes from the same national auction, but the rate you are billed is that auction run through values that belong to your network area. This page sets out the ones used here.
The 2.20 multiplier is the third-highest of the 14 areas, shared with South East England and South Wales.
At a wholesale price of 10p/kWh that gives 22.0p/kWh off-peak and 35.0p/kWh during the peak, before VAT and the levy discount.
The formula above stops two steps short of the rate on your bill, and those steps are the same in every region. VAT is applied, and a green-levy discount is subtracted.
Both are currently at temporary values. The UK government's relief on domestic electricity runs from 1 October 2026 to 31 March 2027 inclusive, and for the whole of that window the VAT multiplier is 1.0 rather than the standard 5%, and the green-levy discount is 3.34p/kWh rather than 3.5p/kWh. Outside the window the standard figures apply, and the two worked examples above are quoted before either step.
Its 0.97 transmission-loss multiplier is joint-highest of the 14 areas.
The same 10p/kWh wholesale price exports at 10.96p/kWh, or 16.93p/kWh during the peak.
Both formulas were last reviewed on .
Octopus Agile is priced per distribution area, so the same wholesale auction produces a different rate in each of Great Britain's 14 GSP groups. The letter in brackets is the region code the site uses in its URLs - /?region=L for South West England, for example. Each region also has a page of its own, listed below.