Agile Rates Logo Agile Rates

Octopus Agile prices in East Midlands

The East Midlands area runs from Derbyshire and Nottinghamshire down through Leicestershire, Rutland and Northamptonshire to Lincolnshire. It is GSP group B, one of the four areas National Grid Electricity Distribution operates, and the one that adds the most during the evening peak.

Agile is a regional tariff. Every half-hour is priced from the same national wholesale auction, but the figure on your bill is that auction put through values specific to your distribution area. This page sets out the ones used for the East Midlands.

Agile Import rates in East Midlands

The 14p/kWh peak addition is the highest of any of the 14 areas.

wholesale
the half-hourly day-ahead auction price, in £/MWh - so a 10p/kWh price enters the formula as 100
2.00
the distribution multiplier for East Midlands
P
the peak adder: 14p/kWh for half hours beginning 16:00-18:59, and 0 at every other time
VAT, levy
applied and then subtracted, in that order, and identically in every region - see the note below. The running total is capped at 95p/kWh before either step.

At a wholesale price of 10p/kWh that gives 20.0p/kWh off-peak and 34.0p/kWh during the peak, before VAT and the levy discount.

VAT and the green levy

The formula above stops two steps short of the rate on your bill, and those steps are the same in every region. VAT is applied, and a green-levy discount is subtracted.

Both are currently at temporary values. The UK government's relief on domestic electricity runs from 1 October 2026 to 31 March 2027 inclusive, and for the whole of that window the VAT multiplier is 1.0 rather than the standard 5%, and the green-levy discount is 3.34p/kWh rather than 3.5p/kWh. Outside the window the standard figures apply, and the two worked examples above are quoted before either step.

Agile Outgoing rates in East Midlands

wholesale
the same half-hourly day-ahead auction price, in £/MWh
0.94
the transmission-loss multiplier for East Midlands
0.78p
the per-kWh benefit, added in every half hour
C
the export peak adder: 6.27p/kWh for half hours beginning 16:00-18:59, and 0 at every other time
VAT, levy
not applied - an export rate carries neither

The same 10p/kWh wholesale price exports at 10.18p/kWh, or 16.45p/kWh during the peak.

Both formulas were last reviewed on .

Octopus Agile prices by region

Octopus Agile is priced per distribution area, so the same wholesale auction produces a different rate in each of Great Britain's 14 GSP groups. The letter in brackets is the region code the site uses in its URLs - /?region=L for South West England, for example. Each region also has a page of its own, listed below.

Site navigation