Agile Rates Logo Agile Rates

Octopus Agile prices & formula in East England

The East England distribution area covers East Anglia and the Home Counties - Norfolk, Suffolk, Essex, Cambridgeshire, Bedfordshire and Hertfordshire. It is GSP group A, the northern half of what UK Power Networks operates, and it holds the highest population of any English region outside London.

Agile prices are not national. Every half-hour slot is priced from the same wholesale auction, but the number Octopus bills you is that auction run through a set of regional values - a different multiplier and a different peak addition for each of the 14 UK areas. This page sets out the ones that apply here.

Agile Import rates and formula in East England

East England's 13p/kWh peak addition is the second-highest of the 14 areas, behind only the East Midlands.

wholesale
the half-hourly day-ahead auction price, in £/MWh - so a 10p/kWh price enters the formula as 100
2.10
the distribution multiplier for East England
P
the peak adder: 13p/kWh for half hours beginning 16:00-18:59, and 0 at every other time
cap(...)
Agile Import rates are capped. The brackets labelled cap hold the ceiling: however high the wholesale price goes, the rate inside them cannot exceed 95p/kWh - and everything outside them, VAT and the levy, is applied to that capped figure, so this is a ceiling on the price before those two steps and not on the rate you pay. It only comes into play at high prices: here it starts to bite once the wholesale price gets up to about 45.2p/kWh.
VAT, levy
applied and then subtracted, in that order, and identically in every region - see the note below.

At a wholesale price of 10p/kWh that gives 21.0p/kWh off-peak and 34.0p/kWh during the peak, before VAT and the levy discount.

VAT and the green levy

The formula above stops two steps short of the rate on your bill, and those steps are the same in every region. VAT is applied, and a green-levy discount is subtracted.

Both are currently at temporary values. The UK government's relief on domestic electricity runs from 1 October 2026 to 31 March 2027 inclusive, and for the whole of that window the VAT multiplier is 1.0 rather than the standard 5%, and the green-levy discount is 3.34p/kWh rather than 3.5p/kWh. Outside the window the standard figures apply, and the two worked examples above are quoted before either step.

Agile Outgoing rates & formula in East England

Its 7.04p/kWh export peak addition is the fourth-highest of the 14 areas.

wholesale
the same half-hourly day-ahead auction price, in £/MWh
0.95
the transmission-loss multiplier for East England
1.09p
the per-kWh benefit, added in every half hour
C
the export peak adder: 7.04p/kWh for half hours beginning 16:00-18:59, and 0 at every other time
VAT, levy
not applied - an export rate carries neither

The same 10p/kWh wholesale price exports at 10.59p/kWh, or 17.63p/kWh during the peak.

Both formulas were last reviewed on .

Octopus Agile prices by region

Octopus Agile is priced per distribution area, so the same wholesale auction produces a different rate in each of Great Britain's 14 GSP groups. The letter in brackets is the region code the site uses in its URLs - /?region=L for South West England, for example. Each region also has a page of its own, listed below.

Site navigation